You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
01 Feb 2020 / Singapore
The working period for works at Tuas Terminal Phase 1 has been extended, and the area has been revised.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.005 of 2020, from 1 February to 31 July, the works will be conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 1 deg. 15.650’N / 103 deg. 37.040’E
2) 1 deg. 15.650’N / 103 deg. 37.135’E
3) 1 deg. 15.608’N / 103 deg. 37.135’E
4) 1 deg. 15.608’N / 103 deg. 37.546’E
5) 1 deg. 15.542’N / 103 deg. 37.546’E
6) 1 deg. 15.542’N / 103 deg. 37.869’E
7) 1 deg. 15.608’N / 103 deg. 37.869’E
8) 1 deg. 15.608’N / 103 deg. 38.644’E
9) 1 deg. 15.678’N / 103 deg. 38.644’E
10) 1 deg. 15.678’N / 103 deg. 38.710’E
11) 1 deg. 15.440’N / 103 deg. 38.709’E
12) 1 deg. 14.550’N / 103 deg. 39.133’E
13) 1 deg. 14.398’N / 103 deg. 38.755’E
14) 1 deg. 14.398’N / 103 deg. 37.039’E
The works will include reclamation, dredging, soil investigation and shore protection removal. Dredging work will be carried out by dredgers which are assisted by tug boats. The dredger will have a circular safety working zone of 70m radius. Dredged materials will be transported to the designated dumping ground by the hopper barges which are assisted by tug boats.
The soil investigation will involve borehole drilling and vibro-coring using jack-up barge. Tug boats will be used to shift the jack-up barges.
A safety boat will be on attendance to warn and direct craft in the vicinity to keep clear of working area.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]