You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
15 Mar 2022 / Singapore
From 21 March to 20 September, works will be conducted at Changi Broadwalk, off Changi Point Ferry Terminal, within the working area bounded by the following coordinates (WGS 84 Datum):
1) 01° 23.534'N / 103° 59.127'E
2) 01° 23.544’N / 103° 59.130'E
3) 01° 23.516'N / 103° 59.214'E
4) 01° 23.504'N / 103° 59.210'E
According to the Maritime and Port Authority of Singapore Port Marine Notice No.015 of 2022, the work will be conducted 24 hours daily, including Sundays & Public Holidays.
The works involves pitching of loose rocks at the top layer of the existing rock revetment and filling of cement mortar into gaps between the pitch rocks. A safety boat will be deployed to warn other craft in the vicinity of the working area.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 21 (Sembawang Control);
and
e) Communicate with Sembawang Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]