You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
20 Apr 2021 / Panama Canal, Panama
Rainfall in the Panama Canal watershed during the past weeks has allowed the Panama Canal Authority (ACP) to postpone the implementation dates for the maximum authorized draft in the Neopanamax locks announced in Advisory to Shipping A-20-2021.
Based on the present and projected level of Gatun Lake for the following weeks, the maximum authorized draft in the Neopanamax locks will remain at 14.94 m (49.0 feet) TFW until further notice. The maximum authorized draft of 14.78 m (48.5 feet) TFW, is hereby suspended.
For further reference on Gatun Lake level estimates, please refer to the following link: https://apps.pancanal.com/t/TI/views/GatunH2OIndicators/GatunWaterLevel?:isGuestRedirectFromVizportal=y&:embed=y
(For information about operations in Panama, contact GAC Panama at [email protected])
Source: Panama Canal Authority Advisory to Shipping No.A-23-2021 dated 19 April 2021