Temporary loading facility at the former Kai Tak Airport Runway

18 Sep 2020 / Hong Kong

A temporary loading facility has been established at the former Kai Tak Airport Runway. The temporary loading facility will operate for a period of approximately 4 months.

One derrick lighter, one flat top barge and two tugboats will berth at the facility within the operation area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline for loading operation:
(A) 22 deg. 18.949’N / 114 deg. 12.093’E
(B) 22 deg. 18.910’N / 114 deg. 12.052’E
(C) 22 deg. 19.037’N / 114 deg. 11.909’E
(D) 22 deg. 19.076’N / 114 deg. 11.950’E

The hours of operation will be from 0700 to 1900 hours. No operation will be carried out on Sundays and public holidays. Vessels engaged in the operation will stay in the operation area outside the hours of operation.

(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])

Source: Government of the Hong Kong SAR Marine Department Notice No.131/2020

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.