Temporary loading facility at Penny’s Bay

30 May 2022 / Hong Kong

A temporary loading facility has been established at Penny’s Bay. The temporary loading facility will operate for a period of approximately six months.

Two derrick lighters and one tugboat will berth at the facility within the operation area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline for loading operation:
(A) 22° 18.608’N 114° 03.239’E
(B) 22° 18.560’N 114° 03.266’E
(C) 22° 18.441’N 114° 03.017’E
(D) 22° 18.489’N 114° 02.991’E

The hours of operation will be round-the-clock.

(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])

Source: Government of the Hong Kong SAR Shipping Department Notice No.109 of 2022

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.