You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
10 Jun 2024 / Panama Canal, Panama
Beginning at 0400 hours on Tuesday, July 9, 2024, until 0400 hours on Friday, July 19, 2024 (10 Days), the center wall culvert of Pedro Miguel Locks will be out of service for scheduled maintenance on cylindrical and rising stem valves. Lockages will take additional time during the maintenance period.
No decrease in capacity is expected, therefore, the limitation in the number of restricted vessels and the number of slots per direction for Supers and Regulars in the Panamax Locks will remain unchanged. Also, the Just-In-Time (JIT) transit slots available for supers and regular vessels transiting without restrictions, will remain in one (1) per direction.
(For information about operations in Panama, contact GAC Panama at [email protected])
Source: Panama Canal Authority Advisory To Shipping No. A-17-2024