You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
29 May 2024 / Singapore
From 1 to 30 June, repair works will be carried out at Jurong Fishery Port.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.47 of 2024, the work will be conducted between 08:00am and 07:00pm - including Sundays and Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01°18.532’N / 103°43.482’E
2) 01°18.528’N / 103°43.493’E
3) 01°18.500’N / 103°43.482’E
4) 01°18.503’N / 103°43.470’E
Repair works will include cutting off the damaged piles and installing new piles in its place. Works will be carried out using a crane barge and will be assisted by tug boats.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 18 (Pasir Panjang Control);
and
e) Communicate with Pasir Panjang Control on VHF Channel 18 for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]