You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
08 Sep 2021 / Panama Canal, Panama
The Panama Canal [has] published a proposal that modifies the waterway's toll structure and the admeasurement regulations for passenger ships.
The proposal eliminates the billing unit on a per berth basis and reinstates the tolls based on PC/UMS (Panama Canal Universal Measurement System) capacity…
…The complete proposal is available at www.pancanal.com/peajes
With the publication of this proposal, the public consultation period is open until October 1, 2021 at 4:15 p.m. local time, during which the industry is invited to review and comment on the proposal for consideration. The public hearing is scheduled for October 5, 2021, for the first time in virtual format, following health and safety protocols.
The modifications will go into effect on February 1, 2022. The last modification to the toll structure for passenger ships was implemented on April 1, 2016.
(For information about operations in the Panama Canal, contact GAC Panama at [email protected])
Source: Panama Canal (www.pancanal.com) press release dated 1 September 2021