You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
29 Oct 2021 / Es Sidra terminal, Libya
Production at the Waha oil field has been restored after being cut by 70% due to two leaks in the Al Dhara pipeline.
The Director of Operations at Waha Oil Company reported yesterday (28 October) that in response to the drop in pressure reported in the pipeline, coordination was established between the control room in the Waha field and with the Waha field monitor in coordination with other fields, Dahra, Sidra and Samah. Two leaks were detected in the 30-inch back line - one 10km from Dhahra in the direction of Es Sider terminal, and the second 27km with the same direction.
A maintenance team has now brought both leaks under control.
(For information about operations in Libya, contact the GAC Dubai Hub Agency Centre at [email protected])
Source: Arroban International Shipping Company – GAC network agent