Post monsoon dredging

06 Dec 2024 / Mumbai, India

Post monsoon maintenance dredging will be carried out at Indira Docks Outer Berths (BPX, BPS & Harbour Wall No. 18-21).

The dredging schedule is as follows:

BPX & BPS
11 to 15 December 2024

Harbour Wall No.18 to 21
4 to 13 January 2025

During these periods, operations at the respective berths will be suspended.

For information about operations in India, contact GAC India at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.