You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
03 May 2021 / Immingham, United Kingdom
Immingham Oil Terminal (IOT) will be closed for testing, preparation, repairs and other work as follows:
IOT Berth 1
0800 to 1700 Tuesday 11 May 2021
Hose testing and ABP mooring equipment maintenance
0800 Tuesday 18 May to 1700 Thursday 20 May 2021
Painting, hose maintenance and crane gearbox routines and rope inspections
IOT Berth 2
0800 to 1700 Friday 21 May 2021
Rope inspections and ABP mooring equipment maintenance
IOT Berth 3
0800 Tuesday 4 May to 1700 Friday 7 May 2021
Loading arm 3/2 removal – this could change to w/c 10 May depending on tidal conditions
0800 Monday 24 May to 1700 Tuesday 25 May 2021
Pipework removal, gangway repairs, fire system maintenance and ABP mooring equipment maintenance
0800 Monday 9 August to 1700 Friday 13 August 2021
Loading arm 3/2 installation
0800 Wednesday 18 August to 1700 Friday 20 August 2021
Annual loading arm maintenance
Finger Pier
0800 Wednesday 26 May to 1600 Thursday 27 May 2021
Fender repairs
South Killingholme Jetty (SKJ)
To allow continued use, and until further notice, regular inspections of the white oil loading arm must be carried out. The berth needs to be unoccupied to allow crane barge access.
0800 Monday 7 June to 1700 Friday 11 June 2021
New loading arm KLA03 installation
0800 Thursday 24 June to 1700 Friday 2 July 2021
Loading arm KLA04 removal and installation of new loading arm
0800 Tuesday 13 July to 1700 Thursday 15 July 2021
Removal of loading arm KLA02 and old hydraulic powerpack
0800 Tuesday 24 August to 1700 Thursday 26 August 2021
New loading arm hydraulic powerpack relocation
Immingham Gas Jetty (full berth, LPG and white oils)
0800 Sunday 23 May to 1700 Saturday 29 May 2021
Pipework modifications, platform repairs and ABP mooring equipment maintenance
0800 Monday 24 May to 1700 28 May
Phillips 66 diving inspection
0800 Monday 16 August to 1700 Tuesday 17 August 2021
Annual loading arm maintenance
Main Transfer Line, Tank and Loading Arm Works
22” Fuel Oil Transfer Line ILI (In Line Inspection) – ILI dates to be confirmed
2 Transfer Line ILI (in line inspection) to be scheduled in September 2021
24” Fuel Oil transfer Line – under road sections to be replaced (x 2) – w/c 7 June – 27 July
B3 LA3/2 to be overhauled in 2021. Proposed dates for critical loading arm removal and installation work – see Berth 3 outages
SKJ Loading Arm Replacement (x 3) – Preparation work will continue to be scheduled ready for new loading arm installation in 2021. Proposed dates for critical loading arm removal and installation work – see SKJ outages.
Finger Pier and Terminal Supply Lines and Custody Meters
Finger Pier loading and terminal supply lines under road replacement
There are 18 lines that come in/out of the terminal through culverts under the road.
The current planned replacement programme is:
8” Ballast line from w/c 10 May
2T/L from w/c 2 August
12” Ballast line from 20 September
GO3 from w/c 3 May
Effect on the business will be communicated as lines are taken out of service.
Custody meter proving 2021 (planned 5 days duration with some disruption to Finger Pier loading)
Week commencing Monday 13 September 2021