You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
23 Dec 2016 / Panama Canal, Panama
The Panama Canal Authority requires that all Neopanamax vessels intending to transit the Panama Canal install, no later than February 28, 2017, a USA standard (NEMA5-15R) 120V, AC, 3-prong power receptacle close to the designated location of the RTK antenna which is part of the Pilot Portable Unit (PPU) utilized by Panama Canal pilots.
Vessels that cannot comply with the installation of the required power receptacle outside the wheelhouse due to the nature of their cargo are exempt from this compliance; however, these vessels must provide an extension cord and an alternate access to route the extension cord from a power receptacle inside the wheelhouse. This will prevent the antenna power cable from being slashed and/or ruptured by the bridge wing doors.
(For information about operation in the Panama Canal, contact GAC-Wilford & McKay at [email protected])
Source: Panama Canal Authority Advisory to Shipping No.A-62-2016 dated 20 December 2016