Multi-buoy system due to the change of SPM

17 Jun 2024 / Santa Marta, Colombia

From 26 June to 4 August, all vessels at the Pozos Colorados terminal will be received at the multi-buoy system for cargo discharge, due to a change of the current SPM.

The terminal dockage fee of USD 62,500.00 will continue to be the same. In addition, the boats for passing the ropes during the mooring maneuver will be provided and invoiced by Pilots Company. The total cost for assistance of this these boats is USD 16,000.00, which includes:
- 2 boats for the mooring maneuver
- 1 permanent boat in the area to replace ropes if needed
- 2 boats for unmooring maneuver.

For information about operations in Colombia, contact the GAC Hub Agency Center at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.