You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
14 May 2021 / Mormugao, India
The maximum permissible drafts, in conjunction with high water, in the [Mormugao] harbour, during the monsoon of 2021 are as follows:
BREAKWATER BERTH – w.e.f. 15 May 2021
08.50m at high water
MOLE BERTH – w.e.f. 15 May 2021
08.50m at high water
1, 2, 3 & part of Berth No.4 up to Bollard No.14 – Not in use at present
4 – w.e.f. 15 May 2021
07.50m at high water
5 – w.e.f. 15 May 2021
14.00m at high water
6 – w.e.f. 15 May 2021
14.00m at high water
7 – w.e.f. 15 May 2021
14.00m at high water
8 – w.e.f. 15 May 2021
12.00m at high water
9 – w.e.f. 15 May 2021
13.00m at high water
10 – w.e.f. 15 May 2021
12.80m at high water
11 – w.e.f. 15 May 2021
12.80m at high water
MDs 1-2 – w.e.f. 15 May 2021
13.10m at high water
MDs 2-3 – w.e.f. 15 May 2021
12.80m at high water
MDs 3-4 – w.e.f. 15 May 2021
12.80m at high water
MDs 4-5 – w.e.f. 15 May 2021
12.80m at high water
MDs 5-6 – w.e.f. 15 May 2021
12.80m at high water
(For information about operations in India, contact GAC India at [email protected])
Source: Mormugao Port Trust Harbour Notice No.05/21 dated 13 May 2021