Maximum permissible draft from 1 May 2025

29 Apr 2025 / Karaikal, India

The maximum permissible draft for the Channel, Berth 1, Berth 2, Berth 3 and Berth 4 up to 31 May 2025, at high water for vessels, has been declared as below:

CHANNEL
Maximum Permissible Draft (metres) up to 235m, Beam 32.26m: 14.0
Maximum Permissible Draft (metres) up to 292m, Beam 45.00m: 13.5

BERTH 1
Maximum Permissible Draft (metres) up to 235m, Beam 32.26m: 14.0
Maximum Permissible Draft (metres) up to 292m, Beam 45.00m: 12.5

BERTH 2
Maximum Permissible Draft (metres) up to 235m, Beam 32.26m: 14.0
Maximum Permissible Draft (metres) up to 292m, Beam 45.00m: 13.5

BERTH 3
Maximum Permissible Draft (metres) up to 235m, Beam 32.26m: 14.0
Maximum Permissible Draft (metres) up to 292m, Beam 45.00m: 13.5

BERTH 4
Maximum Permissible Draft (metres) up to 235m, Beam 32.26m: 14.0
Maximum Permissible Draft (metres) up to 292m, Beam 45.00m: 13.5

(For information about operations in India, contact GAC India at [email protected])

Source: Karaikal Port Notice dated 28 April 2025

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.