You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
27 Jan 2021 / Singapore
From 31 January to 30 July, marine pile repair works will be carried out at the ExxonMobil Terminal, Pulau Ayer Chawan.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.006 of 2021, the works will be conducted within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01° 16·612'N / 103° 41·411'E
2) 01° 16·847'N / 103° 41·627'E
3) 01° 16·836'N / 103° 41·639'E
4) 01° 16·601'N / 103° 41·423'E
The working hours will be 0800-2000 hours Mondays to Saturdays and 0800-1700 hours on Sundays.
The marine repair works entail strengthening of piles and concrete encasement of steel pipe piles at ExxonMobil Pulau Ayer Chawan Berths OE1, OE2 and OE3.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]