Installation of pontoons and gangways at Sentosa Cove Marina

13 Aug 2020 / Singapore

From 13 August 2020 to 12 February 2021, works will be carried out to install pontoons and gangways at Sentosa Cove Marina.

According to the Maritime and Port Authority of Singapore Port Marine Notice No.053 of 2020 dated 12 August 2020, the works will be conducted between 0800 and 2359 hours daily - including Sundays & Public Holidays - within the working area bounded by the following coordinates (WGS 84 Datum):
1) 1 deg. 14.885’N / 103 deg. 50.471’E
2) 1 deg. 14.839’N / 103 deg. 50.518’E
3) 1 deg. 14.764’N / 103 deg. 50.495’E
4) 1 deg. 14.674’N / 103 deg. 50.506’E
5) 1 deg. 14.589’N / 103 deg. 50.489’E
6) 1 deg. 14.544’N / 103 deg. 50.487’E
7) 1 deg. 14.518’N / 103 deg. 50.464’E
8) 1 deg. 14.544’N / 103 deg. 50.459’E
9) 1 deg. 14.548’N / 103 deg. 50.450’E
10) 1 deg. 14.519’N / 103 deg. 50.431’E
11) 1 deg. 14.552’N / 103 deg. 50.372’E
12) 1 deg. 14.588’N / 103 deg. 50.390’E
13) 1 deg. 14.689’N / 103 deg. 50.417’E
14) 1 deg. 14.808’N / 103 deg. 50.414’E

A crane barge will be used to carry out marine piling works. The crane barge will be supported by tug boats and work barge.

A safety boat will be deployed to warn and direct craft in the vicinity to keep clear of working area.

Craft involved in the works will exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 12 (East Control);
e) To contact One°15 Marina Dockmaster’s Office on VHF CH 77 or via telephone, +65 6305 6988, for movement and assistance within the working area;
and
f) Communicate with East Control for assistance, if required.

For information about operations in Singapore, contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.