You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
01 Oct 2021 / Singapore
The working period for floating sea barrier works at Sentosa Beachfront and Sentosa Cove has been extended. The works are now being conducted from 1 October 2021 to 31 March 2022.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.070 of 2021 dated 30 September 2021, the work is being conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
WORK AREA A - SENTOSA BEACHFRONT
1. 1° 15.529'N / 103° 48.332'E
2. 1° 15.390'N / 103° 48.445'E
3. 1° 15.309'N / 103° 48.527'E
4. 1° 15.327'N / 103° 48.546'E
5. 1° 15.379'N / 103° 48.528'E
6. 1° 15.404'N / 103° 48.468'E
7. 1° 15.544'N / 103° 48.356'E
WORK AREA B - SENTOSA COVE
8. 1° 14.388'N / 103° 49.719'E
9. 1° 14.270'N / 103° 49.844'E
10. 1° 14.219'N / 103° 49.929'E
11. 1° 14.241'N / 103° 49.945'E
12. 1° 14.288'N / 103° 49.865'E
13. 1° 14.406'N / 103° 49.739'E
Realignment and joining of floating sea barriers will be carried out using crane barge and work barge. A tug will be deployed to assist the positioning of the crane barge and work barge.
A safety boat will be deployed to warn and direct craft in the vicinity to keep clear of working area.
Craft involved in the work will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 68 (West Control);
e) Communicate with West Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]