You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
10 Jun 2021 / Kolkata, India
Kolkata Port System has achieved a new milestone with the arrival of the first Capesize vessel at Sagar Anchorage.
The 291.98m LOA vessel with a cargo of steam coal bound for Nepal from Abbot Point in Australia called at Sagar after discharging part of its cargo at Vizag.
Lighterage operations are underway using two floating cranes, with the cargo being transported by barges and subsequently handled at the Haldia Floating Terminal, outside the lock gate.
For details about operations in India, contact GAC India at [email protected]