You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
25 Feb 2025 / Nhava Sheva, India
Nhava Sheva Distribution Terminal (NSDT) has advised that from 1 March, dredging will be conducted at the coastal berth and is expected to take about 3-4 weeks, depending upon the extent of work involved.
During this period, coastal cement vessels will be accommodated at the Shallow Water Berth along with other vessels already declared or calling regularly under a shuttle service. As a result, the terminal is expected to face some pre-berthing delays at the Shallow Water Berth, which they will endeavour to reduce as much as possible.
For information about operations in India, contact GAC India at [email protected]