Draft adjustment for Neopanamax Locks

17 Mar 2021 / Panama Canal, Panama

Based on the present and projected level of Gatun Lake for the upcoming weeks, the Panama Canal Authority (ACP) announces that effective April 13, 2021, the maximum authorized draft allowed for vessels transiting the Neopanamax locks will be 14.78 m (48.5 feet) TFW.

Vessels arriving with drafts over 14.78 m (48.5 feet) TFW may be allowed to transit past April 13, 2021, depending on the actual level of Gatun Lake at the time of transit. Otherwise, vessels will be required to trim or off-load cargo in order to be allowed to transit.

For further reference on future Gatun Lake level estimates, please refer to the following link: https://apps.pancanal.com/t/TI/views/GatunH2OIndicators/GatunWaterLevel?:isGuestRedirectFromVizportal=y&:embed=y

The ACP continues to monitor the level of Gatun Lake in order to announce future draft adjustments in a timely manner.

(For information about operations in Panama, contact GAC Panama at [email protected])

Source: Panama Canal Authority Advisory to Shipping No. A-17-2021 dated 15 March 2021

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.