You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
11 Aug 2022 / Hong Kong
For approximately two months, construction of subsea pipeline will be carried out along the following co-ordinates (WGS 84 Datum) from (A) to (G):
(A) 22° 25.312’N 113° 53.631’E
(B) 22° 25.282’N 113° 53.504’E
(C) 22° 25.150’N 113° 53.056’E
(D) 22° 24.925’N 113° 53.631’E
(E) 22° 24.557’N 113° 53.342’E
(F) 22° 24.111’N 113° 53.242’E
(G) 22° 23.337’N 113° 53.246’EThe works will be carried out by one flat-top work barge and one hopper barge. One dumb lighter one special purpose vessel, on etugboat and two guard boats will provide assistance.
A working area of approximately 50 metres around each barge will be established. Yellow marker buoys fitted with yellow flashing lights and radar reflectors will be laid to mark the positions of the anchors extending from the barges.
A silt curtain fitted with yellow flashing lights will be established within the works area. The silt curtain is a large piece of netting used to contain mud and sediments.
The hours of work will be round-the-clock.
Vessels engaged in the works will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution.
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.166/2022