You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
30 Sep 2015 / Singapore
The working period for the construction of the Aviation Park staging ground and Changi East Finger has been extended.
The work will now be conducted 24 hours daily - including Sundays & Public Holidays - from 2 October 2015 to 1 April 2016, within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01 deg. 21.340'N / 104 deg. 02.416'E
2) 01 deg. 21.464'N / 104 deg. 02.520'E
3) 01 deg. 21.226'N / 104 deg. 02.827'E
4) 01 deg. 20.843'N / 104 deg. 02.821'E
5) 01 deg. 20.707'N / 104 deg. 02.626'E
6) 01 deg. 20.707'N / 104 deg. 02.358'E
7) 01 deg. 20.498'N / 104 deg. 02.387'E
8) 01 deg. 20.495'N / 104 deg. 02.095'E
9) 01 deg. 20.866'N / 104 deg. 01.748'E
The construction of Aviation Park Staging Ground will involve the provision of installation of buoys, construction and management of the staging ground and related activities, including environmental monitoring and surveys.
The construction of Changi East Finger extension will involve sand filling, installation of prefabricated vertical drain, vibro-flotation, stone revetment, scouring protection, construction and removal of instrumentation clusters, as well as the installation and subsequent removal of silt barricades. The works will be carried out by the work barges.
Safety boats will be deployed to warn other craft in the vicinity of on-going work.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 21 (Sembawang Control);
and
e) Communicate with Sembawang Control on VHF Channel 21 for assistance, if required.
(For information about operations in Singapore contact GAC Singapore at [email protected])
Maritime and Port Authority of Singapore Port Marine Notice No.122 of 2015