You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
03 Jul 2023 / Philadelphia, United States
Monroe Energy has advised that dock soundings performed at Philadelphia’s ship dock on 21 June and the barge docks on 15 June reveal that the ship dock depth has changed.
The current depth at the ship dock, referenced to the MLLW datum, is changed to 39'00" (11.88 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 38' 00" (11.58 m).
The current depth at the barge dock, referenced to the MLLW datum , remains at 30'00". The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29' 00".
For further details, as well as information about operations in the United States, contact GAC North America at [email protected]