Bulk Ore Terminal shipping shut schedule

10 Jun 2020 / Port Elizabeth, South Africa

Transnet Port Terminals has advised that Port Elizabeth Bulk Ore Terminal (PEBOT) will shut to shipping between 4 and 10 July.

The terminal is currently operating at 60% effective level mover the one berth with two day shifts and no night shift.

For information about operations in Port Elizabeth, contact GAC South Africa contact us on [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.