You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
23 Oct 2024 / Libya
The Libyan Ministry of Transport Ports & Maritime Transport Authority has announced new measures for tankers arriving at oil terminals from Black Sea ports.
This comes after a tanker was found to have been subject to the attachment of sea mines present in the conflict zone in the Black Sea, which caused explosions in the engine room.
When any tanker arrives from Black Sea ports towards loading platforms in Libyan ports, before it can be approved, the following must be done:
1. Increase the security level to the second level on the ship.
2. Carefully inspect and ensure the validity of the tanker’s original certificates, its issuing authority and insurance documents.
3. Verify that they did not handle the shipment using the STS method, after review of the shipment documents.
4. Examine the vessel with care, especially under the hull.
For further details, as well as information about operations in Libya, contact the GAC Hub Agency Centre at [email protected]